Road Construction
Subcontract
Client:
Niger Delta Development Commission
Location: Abua Odual LGA, Rivers
State
Scope: Dredging, Construction
Overview: The 23KM road linking
Adada and Oruma towns was designed to traverse through swamp
and cross 4 rivers. Our subcontract involved confirmation
surveys, clearing the right of way for the road, geotechnical
survey and sub-soil investigation, soil stripping/ earth
moving and eventual backfilling of the road to a level of
1.5M above the existing grade. The total volume of sand
which SAV dredged and used for the backfilling operation
exceeded 350,000m3.
Access Road Contracts
Client: Kogi State Government
Location: Lokoja and Idah,
Kogi State
Scope: Construction
Overview: Access roads, within
the Governor’s Lodge complex and to the palace of
the traditional ruler of Idah, totaling 10KM were constructed
by us within budget and on time for our client. The asphalt
overlay roads were constructed in difficult rocky terrain
which was especially challenging.
|